If required to cross sidewalks, dig the trench right down to the demanded depth on either side, then bore a lateral gap beneath the sidewalk by driving a piece of rigid pipe or conduit horizontally. Then, run the conduit beneath the sidewalk with the gap you bored. A conduit method https://accessoryboxes12234.post-blogs.com/50785497/little-known-facts-about-cable-management