In the beginning, the Jai Hind metro station was prepared to be elevated. Nonetheless, the AAI objected the elevated stretch up to your airport could pose a menace to aircraft, And so the route was further reworked and the station was shifted underground, one hundred fifty m in the Airport terminal https://railwaygroupdjobs54275.total-blog.com/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf-58154543